Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Crystal City Metrorail East Entrance Will Enhance Connectivity, Accessibility, and Capacity

ARLINGTON, VA — The Arlington County Board has approved the $146 million Washington Metropolitan Area Transit Authority (WMATA) Crystal City Metrorail Station East Entrance for final design and construction, a critical addition to the station that will serve as a second entryway. Situated amid National Landing, a bustling area of growth and redevelopment, this new entrance will meet a need for increased capacity and enhanced connectivity. VHB is program management lead, overseeing all planning, design, and environmental compliance, as a partner to developer, JBG Smith, and contractor, Clark Construction.

The east entrance of the Crystal City Metrorail Station is not only a new addition but will contribute to the development of a multimodal hub that will connect commuters to a range of transportation options. As the location for Amazon’s HQ2, National Landing is a community with a plethora of amenities, including urban parks, residential neighborhoods, industrial and institutional campuses, and mixed-use conveniences. The east entrance of the station will heighten connectivity to the greater National Capital Region, shorten commute times, relieve congestion, and enhance accessibility needs.

“This project is a special one,” said Meghan Powell, VHB Mid-Atlantic Director of Transit & Rail. “Even before the pandemic, this station was filled with activity during peak hours, a testament to its importance as a vital transportation link. Its expansion will support regional connectivity, linking to numerous additional multimodal projects that are shaping up in the area.”

Design for the new entrance was 30% complete in spring 2023 as part of a Public-Private Education-Facilities and Infrastructure Act proposal led by JBG Smith in 2019. The design includes elevator upgrades, Americans with Disabilities Act accessibility improvements, enhanced emergency access, and a new underground passageway. VHB’s role included coordinating completion of the 30% design with subconsultant designers, Arlington County and WMATA.

Bomag - Roller
Your local Bomag Americas dealer
Linder Industrial Machinery
Volvo Roadbuilder
Your local Volvo Construction Equipment dealer
Richmond Machinery & Equipment
Topcon Construction Products
Your local Topcon Positioning Systems Inc dealer
Linder Industrial Machinery
SITECH
Your local Trimble Construction Division dealer
SITECH Mid-South